Click for Northern Lights Click for Westport Click for Abeking Click for Delta Click for JetForums

CAT C18 marine engines Overhaul intervals

Discussion in 'Engines' started by Ahmed Tolba, Jul 4, 2023.

You need to be registered and signed in to view this content.
  1. Ahmed Tolba

    Ahmed Tolba New Member

    Joined:
    Jul 3, 2023
    Messages:
    1
    Location:
    Egypt
    Hello all:
    What is your recommendation for CAT C18 marine engine overhaul intervals as my client want to increase the time than the CAT manuals (OEM) he wants to do Top end overhaul at 10,000 hours and major at 20,000 hours but I see this to long period for this type of engines?
  2. Capt Ralph

    Capt Ralph Senior Member

    Joined:
    Sep 8, 2004
    Messages:
    13,389
    Location:
    Satsuma, FL
    I don't think anybody is going to blindly tell you, it is O K just to extend the MFG service intervals.

    But, One idea:

    Cat also uses fuel consumption as a service clock.
    This makes a lot of sense, the less horse power you make, the less fuel you consume and amazingly, the less wear on your engines.
    Slow down,,, your engines may live longer.

    Find this fuel clock routine from Cat. It may be the only safe way to extend the service clock by hours.
    Ahmed Tolba likes this.
  3. Pascal

    Pascal Senior Member

    Joined:
    Feb 29, 2008
    Messages:
    8,527
    Location:
    Miami, FL
    The manuals for the cats I ve tun (3412Es and C32s) have all service intervals in hours or fuel used which ever comes first.

    the best tool to extend major service intervals is regular oil analysis. And the obvious like watching for smoke, performance etc
    Ahmed Tolba likes this.
  4. Capt J

    Capt J Senior Member

    Joined:
    Jul 11, 2005
    Messages:
    14,517
    Location:
    Fort Lauderdale
    CAT is favoring fuel burned over hours when figuring rebuild times these days. That being said, there's nothing stopping your client from doing what he wants to do, just as there is nothing stopping the engine from grenading doing that as well. It's a risk, how much risk does your client want to take, and is he prepared to do a major or replace the engine completely if it blows.

    One caveat- if you're talking about generators running non stop, constant speed and doing tons of hours running for days on end, you may be able to get away with extending periods.
    Ahmed Tolba likes this.