Click for Westport Click for Northern Lights Click for Abeking Click for Abeking Click for Perko

Build Update: Bering 145 Expedition Flagship

Discussion in 'Bering Yachts' started by Yacht News, Oct 19, 2020.

You need to be registered and signed in to view this content.
Thread Status:
Not open for further replies.
  1. Bering 145 Expedition Flagship Update
    The future flagship of the Bering Yachts lineup is presently under construction and will likely be completed in the latter part of 2021. The yacht is a massive 44-meters (large for Bering Yachts) and being built in Turkey. Construction is moving apace and the nearly completed hull was recently brought outside of the shed to be turned into its upright position. The design of the yacht is by Bering themselves from the Naval Architecture to the exterior design.
  2. The owners of this new Bering are particularly involved and are fairly experienced too. They wanted hybrid propulsion and a yacht with a range north of 4,000 nautical miles when cruising at a continuous 12-knots. Top speed is 15-knots with 95,600 LT of fuel on board while fresh water capacity is for 13,700 LT.
  3. Twelve guests can be accommodated onboard in her six cabins. There is the owner's master suite on the main deck forward and then there are five other cabins for guests. Crew capacity onboard is also for twelve. With a 9.7-meter beam (32-feet) this yacht is plenty spacious for extended exploration. Now that the hull is completed, the continuation of construction can continue.

    For more information:

    Bering Yachts
    12608 Leatherwood Ct.
    Raleigh, NC 27613
    www.****************

    ***
Thread Status:
Not open for further replies.