Click for Walker Click for Northern Lights Click for YF Listing Service Click for Ocean Alexander Click for JetForums

240 volt ac panel internal hook ups

Discussion in 'Technical Discussion' started by dennismc, Aug 13, 2018.

You need to be registered and signed in to view this content.
  1. dennismc

    dennismc Senior Member

    Joined:
    Jan 29, 2009
    Messages:
    1,177
    Location:
    Vancouver BC
    Trying to find a diagram as to how the 240 connects inside the main panel after coming thro the iso transformer.
    It feeds 3 sub panels, 120 volt house stuff then two smaller sub panels with stove, dryer compressor etc, all the transfer switches can use either shore, gen 1 or gen 2 at the same time. very difficult to see inside with all the support framework etc but if I could see a daig that would show it simply would really help, lots of info on the net but not really applicable to me.
  2. Capt J

    Capt J Senior Member

    Joined:
    Jul 11, 2005
    Messages:
    14,531
    Location:
    Fort Lauderdale
    ON WHAT boat?
  3. dennismc

    dennismc Senior Member

    Joined:
    Jan 29, 2009
    Messages:
    1,177
    Location:
    Vancouver BC
    70 ft stephens MY no internal wiring diag of the panel available so looking for what would be logical.
  4. Capt J

    Capt J Senior Member

    Joined:
    Jul 11, 2005
    Messages:
    14,531
    Location:
    Fort Lauderdale
    Get a borescope camera and follow the wiring would be the easiest.
  5. dennismc

    dennismc Senior Member

    Joined:
    Jan 29, 2009
    Messages:
    1,177
    Location:
    Vancouver BC
    OK, will be difficult as there are a massive amount of of wires in there, a question if someone knows the answer, does all power sources terminate normally terminate onto a bus bar prior to distribution to ea transfer switch. i.e shore power , gen 1 and gen2.
  6. Capt J

    Capt J Senior Member

    Joined:
    Jul 11, 2005
    Messages:
    14,531
    Location:
    Fort Lauderdale
    They should go directly to the transfer selector switch or switching mechanism on newer boats. You cannot combine the supply from the generators and shorepower at a bus bar because if a generator is running while you plug in shorepower, you'd have a massive electrical meltdown. What specific issue are you having in order to ask this question?
  7. Pascal

    Pascal Senior Member

    Joined:
    Feb 29, 2008
    Messages:
    8,546
    Location:
    Miami, FL
    i don’t know how it was done on your boat but if you have two or more set of selector switches (whether rotaries or breakers with safety slides) the feed for all sources can be routed two ways.

    Either from the sources (gens/xformer) to the first selector and from there to the next or to a set of bus/post from which it is split to each transfer switch. I think the second way is better if you have more than 2 sub panels with their own selectors
  8. dennismc

    dennismc Senior Member

    Joined:
    Jan 29, 2009
    Messages:
    1,177
    Location:
    Vancouver BC
    I
    Think Pascal has it ea selector sw can use ea source of power so there may be a post distribution set up
  9. Bill106

    Bill106 Senior Member

    Joined:
    Jan 9, 2010
    Messages:
    390
    Location:
    Beaufort NC
    Can you identify the brand/model of the panel by any chance or is it an in-house custom? A few of the major panel manufacturers do publish schematics and drawings of their standard panels. A picture might allow some of us on here to identify it if you can't find any tags or labels.
  10. dennismc

    dennismc Senior Member

    Joined:
    Jan 29, 2009
    Messages:
    1,177
    Location:
    Vancouver BC
    Its custom. no names and and some adds etc. Tks to all for responses
  11. Capt Ralph

    Capt Ralph Senior Member

    Joined:
    Sep 8, 2004
    Messages:
    13,442
    Location:
    Satsuma, FL
    So, What problems are you having again?
  12. dennismc

    dennismc Senior Member

    Joined:
    Jan 29, 2009
    Messages:
    1,177
    Location:
    Vancouver BC
    Am addi g 240v inverter so wanted to see what might be the panel config
  13. Capt Ralph

    Capt Ralph Senior Member

    Joined:
    Sep 8, 2004
    Messages:
    13,442
    Location:
    Satsuma, FL
    On one of our customers boats we are adding two 230Vac inverters with 115Vac auto transformer outputs.
    Dual auto switching input (shore or generator). The dual output allows the generator or shore power to supply to water heaters and heavy ACv load items while charging the LIs batteries. On inverter only the water heaters and some other heavy ACv items will not run.
    Gen-sets will auto start-stop when the Lithium-Ion sulfide batteries need charging or need additional help.
    Niehoff 400 Amp alternators will drive the system while the ship is operating.

    Now on our personal South GA budgeted boat's 115Vac inverter, I just removed the outlets I wanted on the inverter from their original buss bar, attached them to a new buss bar feed from the inverter.

    What 240Vac devices are you planning to run on your inverter? Batteries?
  14. dennismc

    dennismc Senior Member

    Joined:
    Jan 29, 2009
    Messages:
    1,177
    Location:
    Vancouver BC
    The 120v panel, stove and thats about it.
  15. Capt Ralph

    Capt Ralph Senior Member

    Joined:
    Sep 8, 2004
    Messages:
    13,442
    Location:
    Satsuma, FL
    Stove? Gas I hope?
  16. Capt Ralph

    Capt Ralph Senior Member

    Joined:
    Sep 8, 2004
    Messages:
    13,442
    Location:
    Satsuma, FL
    Depending on the inverter, you can just insert it in the black and white (US
    Code) wires at the top of the 120Vac panel.
    If a smaller inverter without an internal transfer switch, it will be a bit more work. This is where the all in one inverters pay for them selves.
  17. dennismc

    dennismc Senior Member

    Joined:
    Jan 29, 2009
    Messages:
    1,177
    Location:
    Vancouver BC
    Stove is electric but, only on one ring when underway, still deciding on best way to hook up need to trace the inputs and where they go. I have a spare input/output on the main shore incoming transfer sw, so would at least hook it that as a start.