Jag hit the water https://www.kn-online.de/Lokales/Rendsburg/Kroeger-Werft-laesst-Megajacht-vom-Stapel
another pic https://www.shz.de/lokales/landesze...kt-Rohbau-einer-Megajacht-aus-id32670347.html the mast it's huge!
https://www.shz.de/img/lokales/crop...r-kanal-schlepper-parat-202106221309-full.jpg https://www.shz.de/img/video/crop32669357/671171849-cv4_3-w1200/3463372-7t8GmwCKR6MqVPLv.jpg https://www.shz.de/img/lokales/crop...r-kanal-schlepper-parat-202106221309-full.jpg
A quick check with the project Management for this build does reveal a change to 122M. She was previously stated as 125M.
The midships glazing looks like it will be an addition to the exterior. Based on what we have seen with the bare-metal launch...there is no fabrication for these glass pieces to be integrated into the superstructure. IF, this is still part of the plan for the finished yacht maybe it will be added on the exterior like cladding.
It's #FlashbackFriday so let's look back at when Project Jag had her technical launch down the slipway...this was back in mid-June of this year.