A new Feadship is soon expected to arrive at the new Feadship yard in Makkum. The yard was busy recently installing the dry dock door that will control and block the water floor into the dock. Feadship's Hull 1009 is due to shortly arrive there, hopefully by next week we may see something.
...and she has been technically launched now from Scheepswerft SLOB. She will be transported to Makkum and take up residence in the new shed there.
Here is another look at Project 1009 after she was launched from Scheepswerft Slob. A couple notable features we can see onboard include slide out or fold-out navigation wing stations (not added in the photo), Appears she will have a pool on the aft main deck but a raised one so it doesn't cut too much into the beach-club space directly below. Fold out terraces on either side for the beach club, the main tender garage is just forward of the beach club. It appears there is a secondary tender garage in the bow...likely to carry a crew tender and rescue boat or toys. Certainly enough space on the bow to fit a touch-and-go helipad. She is due to be completed in 2021.
Yep. Let's remove the pool from the main deck cause we really need some more deck space. Instead of the white slats or louvers they should have made some out of wood or chromed them. That would have added some style. As it is. Just another white yacht with lots of room for shuffle board.
Drone video of Bliss The pool is definitely not a raised one but has a movable swimming floor so the swimming pool deck will be a multifunctional area
"BLISS" has commence seat trials. https://www.instagram.com/tv/CQjIEAVh--t/?utm_source=ig_web_copy_link
Feadship announced the delivery of "Bliss"...she since left on her maiden voyage. She left Harlingen and is enroute to Gibraltar.
Notice since launch she has removed the domes from the very top of the mast and replaced them with Starlink dish panels...4 of them are on the mast.