On April 15th 2006, less than twelve months after her keel was laid, Y-702’s hull and superstructure were ready to be transferred to the oceAnco facility. Later that day, the superstructure was positioned on the hull before the yacht was transported to the quay at the oceAnco facility in Alblasserdam. She was carefully lifted out of the water, in her cradles; where after heavy lift multiwheels were used to move her into the building shed. Final outfitting commenced immediately on Y-702 in anticipation of her summer 2007 delivery. Y-702 is currently in the shed alongside the Y-701, 80m and it is truly an impressive view. Stunning lines and striking volumes already characterise this new oceAnco yacht, which is a proud new member of the existing large yacht fleet. Follow this link for the original renderings & specs... http://www.yachtforums.com/forums/oceanco-yacht/4329-new-oceanco-y702.html For more information, contact: OceAnco 7 rue du Gabian 98000 Monaco www.****************
The following images were supplied by Michele Flandin, Oceanco's marketing director. These images were taken of the superstructure prior to the picture shown above (^). The superstructure is two seperate modules, a forward and an aft section. Here, the two halves are resting on a barge, waiting to be lifted and placed on top of the hull, seen in the forefront of this photograph...
Working through the day and into the night, the aft section of the superstructure is lifted from the barge while workers prepare to position the module over the hull...